Thursday, November 26, 2015

WIS 19 Safety and Operations Study Public Involvement Meeting

December 3, 2015
Waunakee Village Hall
500 West Main Street
Waunakee, WI 53597
3:00 PM - 5:00 PM

The Wisconsin Department of Transportation, Southwest Region (WisDOT) is studying WIS 19 from US 12 (Town of Springfield) to WIS 89 in the City of Waterloo. This is a planning-level preservation study in which the primary goal of the study is to develop a long term plan for maintaining safety and mobility on the existing corridor.

Click the link below for more details:

WIS 19 Safety and Operations Study